Easy Steps: How To Hang Cabinets In Kitchen

Can I install kitchen cabinets myself? Yes, absolutely! Many homeowners successfully complete the installing kitchen cabinets DIY project by following a clear, step-by-step process. This comprehensive guide will walk you through the entire procedure, from preparation to the final tightening of screws, ensuring your kitchen looks fantastic.

Preparing for Cabinet Installation Success

Good preparation saves a lot of time and frustration later. Before you even think about mounting kitchen cabinets, you need the right tools and a perfectly prepped space. This initial phase is vital for a straight, sturdy installation.

Gathering Essential Tools and Materials

You cannot start without the right gear. Make sure everything is on hand before the first box is opened. This list covers what you will need for a successful kitchen cabinet installation guide.

  • Measuring Tools: Tape measure, long level (4-foot is best), speed square.
  • Marking Tools: Pencil, chalk line or long straight edge.
  • Fastening Tools: Power drill/driver, various drill bits, clamps (cabinet or bar clamps are very helpful).
  • Cutting Tools: Stud finder (essential!), utility knife.
  • Safety Gear: Safety glasses, gloves.
  • Cabinet Hanging Hardware: This includes screws, specialized cabinet hanging hardware, and potentially kitchen cabinet mounting brackets or a dedicated kitchen cabinet hanging system.
  • Support: Strong temporary supports like 2x4s or dedicated cabinet jacks.

Site Preparation and Layout

The walls must be ready. Walls that aren’t flat or surfaces that aren’t plumb will cause major alignment issues.

Locating Wall Studs Accurately

This is non-negotiable for securing upper kitchen cabinets or any cabinet.

  1. Use a Stud Finder: Scan the wall where the back of the cabinets will rest. Mark the edges of every stud lightly with a pencil.
  2. Verify with Nailing: Drive a small finishing nail through the drywall where you think the center of the stud is. If you feel solid wood, you found it. Confirm the location across the entire span.
  3. Mark the Centerline: Draw a continuous vertical line down the center of each stud. This is where your screws will go.

Establishing the Layout Lines

You need a clear roadmap on your wall. This ensures the cabinets line up perfectly.

  • Base Cabinet Height: Standard countertop height is 36 inches from the finished floor. Measure up 34.5 inches from the floor and draw a long, level line across the entire wall. This line marks the bottom of your base cabinets. Always check the manufacturer’s specs, as some cabinets vary slightly.
  • Upper Cabinet Height: The standard gap between the countertop and the bottom of the upper cabinets is 18 inches. Measure up 54 inches from the finished floor (34.5″ for the base + 18″ gap = 54″). Draw another long, level line. This line marks the top of your upper cabinets. Use your 4-foot level often here.

Hanging Base Cabinets: The Foundation

Always start with the base cabinets. They set the height and alignment for everything else. If the base cabinets are crooked, the counters will be crooked, and the uppers will be impossible to align. This section covers hanging base cabinets.

Preparing the Cabinets

Open the boxes. Inspect all cabinets for damage. Remove any doors or drawers; this makes the boxes lighter and easier to handle.

Placing the First Base Cabinet

The first cabinet sets the stage. Usually, this starts in a corner or next to the longest uninterrupted run.

  1. Positioning: Place the first cabinet box so its bottom edge sits exactly on your marked 34.5-inch layout line.
  2. Plumbing the Cabinet: Use your level on the side panels (left to right) and the front edge (front to back). You must make it perfectly plumb (vertically straight).
  3. Shim Adjustment: If the wall is uneven, you need shims. Place thin wood shims between the cabinet back and the wall until the level reads true in all directions. Do not over-shim; keep it minimal.
  4. Securing to the Wall (Temporary): Drive one long screw through the back rail of the cabinet near the top, but only into one stud. Make it snug, but leave it slightly loose. This holds it in place while you check leveling.

Leveling and Securing the Run

Now you connect the rest of the base cabinets.

Leveling and Alignment Between Cabinets

This is where professional cabinet installation techniques really shine. You need them touching snugly before permanent fastening.

  • Connect to the First Box: Move the next base cabinet into place, touching the first one.
  • Check Leveling: Check the top surface of both cabinets with your level. If the adjacent cabinet is too high or low, tap gently with a rubber mallet or adjust the shims underneath. Once the tops are flush and level, check the front faces for plumbness.
  • Clamping: Use strong cabinet clamps to pull the two cabinet boxes tightly together along the front edge. This ensures a gap-free seam.
  • Drilling Pilot Holes: Drill pilot holes through the side panel of the second cabinet into the first cabinet’s cabinet side rail. Drill two holes per joint—one near the top, one near the bottom.
  • Screwing Together: Use cabinet screws (usually 2.5 or 3 inches long) to firmly join the boxes. Do not overtighten, or you might crush the wood.

Final Wall Fastening for Base Cabinets

Once all base cabinets are connected and aligned, you must secure them firmly to the wall studs.

  1. Check Stud Marks: Refer back to your marked centerlines on the wall.
  2. Screwing Through the Rail: Drive long cabinet screws through the top rail and bottom rail of each cabinet, directly into the wall studs. Use at least two screws per cabinet side into the stud. Ensure screws pass through the shim material if used.
  3. Checking Level Again: After screwing into the studs, re-check the level on the top surface. Any movement due to fastening will show up here.

Hanging Upper Kitchen Cabinets: Precision Work Above

Securing upper kitchen cabinets requires extra care because they are supported entirely by the wall anchors (studs). Gravity is not your friend here! This is often the trickiest part of the kitchen cabinet installation DIY process.

Setting Up Temporary Support

You cannot hold heavy cabinets overhead for long periods. Use temporary supports.

  • Support Method: Place sturdy 2x4s across sawhorses or specialized cabinet jacks beneath the layout line (the 54-inch mark). The top edge of the 2×4 should sit just slightly below your layout line. This gives you a shelf to rest the cabinets on while you secure them.

Installing the First Upper Cabinet

Just like the base cabinets, the first upper sets the entire line.

  1. Positioning: Lift the cabinet onto your temporary support. Place the cabinet so its top edge aligns perfectly with your 54-inch layout line. The back should touch the wall.
  2. Plumbing and Shimming: Use the level to make sure the sides are plumb (vertical) and the front is plumb (front to back). Use shims behind the cabinet if needed to maintain plumbness against the wall.
  3. Attaching to the Wall: Drive screws through the cabinet’s top and bottom rails directly into the wall studs. Use long, heavy-duty screws meant for mounting kitchen cabinets. Ensure screws go deep into the stud material—at least 1.5 inches into solid wood.

Aligning and Connecting Subsequent Upper Cabinets

Connecting uppers requires careful attention to both vertical and horizontal alignment.

Joining Upper Cabinets Together

  1. Positioning: Bring the next cabinet up to the first one.
  2. Alignment Check: Check the top edges and the front faces. They must line up perfectly both vertically and horizontally. Adjust shims or gently tap the cabinet into place.
  3. Clamping: Clamp the two boxes tightly together.
  4. Screwing Together: Drill pilot holes and drive cabinet screws through the side rails to join them securely, just as you did with the base units.

Final Level Check and Securing

  1. Level Check: Use the long level across the top of the connected cabinets. Ensure the entire run is level from end to end.
  2. Final Wall Fastening: Drive screws through the back rails into the studs for permanent anchoring. Remember: screws must go into studs for upper cabinets.

Utilizing Specialized Hardware

Sometimes, shimming and screwing directly into studs is not enough, or perhaps the wall studs don’t line up perfectly with the cabinet design. This is where kitchen cabinet mounting brackets or a kitchen cabinet hanging system become useful.

  • Hanging Rails/Strips: Some systems use a long metal rail screwed securely into the studs above and below the intended cabinet line. The cabinets then hook onto this rail. This is an advanced form of cabinet hanging hardware that simplifies alignment immensely, especially for heavier units or tile backsplashes.

Fine-Tuning and Finishing Touches

Once the boxes are hung, the hard structural work is done. Now comes the crucial step of making sure everything is perfectly straight before installing doors and drawers.

The Importance of Leveling Kitchen Cabinets

Even if you were careful, things shift slightly during the fastening process. Leveling kitchen cabinets is the final quality check.

  • Base Cabinets: Place your level across the top of every single base cabinet. If one section is slightly off, use a thin shim under the base of the cabinet (at the front or back) to raise it. Adjust until the tops are perfectly level across the whole run.
  • Upper Cabinets: Check the tops and the bottom edges of all upper cabinets. They must be perfectly level horizontally and vertically. Minor adjustments are made by slightly loosening the wall screws, tapping the cabinet, inserting a shim if needed, and re-tightening.

Dealing with Out-of-Plumb Walls

Walls are rarely perfectly straight. When installing cabinets against an uneven wall, you must accept the slight variation in the gap between the wall and the cabinet back, or you must shim out the entire cabinet run.

  • Shimming the Run: If the wall bows in, place shims behind the cabinet corners so the front edges are flush and plumb. You are essentially making a “fake wall” inside the cabinet for the screws to bite into.
  • Gap Management: Any resulting gap between the cabinet back and the actual wall should be covered later with filler strips or molding.

Installing Filler Strips

Filler strips cover gaps where cabinets meet a wall or another cabinet run, hiding imperfections from uneven walls or cutting mismatches.

  1. Measure the Gap: Measure the widest part of the gap between the cabinet and the wall.
  2. Cut the Strip: Cut a wood strip (often 1/4″ or 1/2″ thick) to match that measurement.
  3. Shaping: Hold the strip against the cabinet and wall. Trace the exact contour of the wall onto the back edge of the filler strip.
  4. Cutting the Profile: Use a jigsaw or belt sander to cut away the traced area. The strip should now fit perfectly snug against both the cabinet and the wall.
  5. Attaching: Secure the strip to the cabinet face frame using finish nails or glue and clamps.

Transitioning to Doors and Drawers

With the boxes securely fastened, it is time to install the moving parts.

Drawer Slides and Runners

Drawer slides usually come in two parts: one attaches to the cabinet interior, and the other attaches to the drawer box itself.

  1. Cabinet Slides: Mount the cabinet portion of the slide, ensuring it is perfectly level and positioned at the height specified by the slide manufacturer. Use the pre-drilled holes or measure precisely.
  2. Drawer Box Slides: Attach the matching slides to the drawer box sides.
  3. Insertion: Carefully slide the drawer into the cabinet runners until you hear a click, indicating they are locked. Test the action.

Hanging Cabinet Doors

Modern cabinet hanging hardware almost always involves European-style concealed hinges. These are very adjustable, which is great for DIYers.

  1. Attaching Hinge Cups: Drill the required hole for the hinge cup into the door itself, usually near the top, middle, and bottom edges. Snap the cup into the hole.
  2. Attaching Mounting Plates: Screw the mounting plates onto the inside face frame of the cabinet box.
  3. Mounting the Door: Align the door hinge arms with the mounting plates and snap or screw them together.

Adjusting Concealed Hinges

This adjustment system is your best friend for achieving perfect door alignment. Hinges usually have three adjustment screws:

Screw Location Adjustment Function Result
Front Screw (Side-to-Side) Moves the door left or right. Fixes gaps between doors.
Middle Screw (In/Out) Moves the door closer or further from the cabinet face. Fixes depth alignment.
Rear Screw (Up/Down) Moves the door up or down relative to the cabinet box. Fixes height alignment (usually adjusted before full attachment).

Adjust these screws gently until all doors line up perfectly with each other and the drawer fronts.

Considerations for Specific Cabinet Types

Different areas of the kitchen require slightly different professional cabinet installation techniques.

Over-the-Refrigerator Cabinets

These cabinets are often taller and shallower. They require very secure fastening because they are high up and usually span a wide area.

  • Ensure you hit solid framing above the refrigerator opening. If the studs do not line up well with the cabinet back, you might need to screw blocking (a solid piece of wood spanning between two studs) inside the opening first, then screw the cabinet into that solid block.

Corner Cabinets

Corner cabinets can be L-shaped or use lazy susan mechanisms.

  • L-Shape: Start by hanging one side of the L-shape first, ensuring it is perfectly plumb and level. Then, attach the second cabinet section to the first, using the corner joint as your guide for alignment. Use extra reinforcement screws in the corner joint.
  • Lazy Susan: These often require securing the shelf supports to the cabinet sides before assembly, and the outer box must be absolutely square (using a speed square) before mounting to the wall.

Safety First When Mounting Kitchen Cabinets

Working overhead and with heavy boxes always carries risk. Follow these safety tips throughout your installing kitchen cabinets DIY journey.

  1. Never Work Alone: Especially when lifting upper cabinets, always have at least one helper.
  2. Secure Your Ladder: Use a stable ladder and ensure it is on firm, level ground.
  3. Wear Eye Protection: Sawdust and drill bits can send debris flying. Safety glasses are mandatory.
  4. Don’t Overload Supports: If using temporary supports, ensure they can handle the weight of the cabinet plus the weight of the person lifting it temporarily.

Final Review of the Kitchen Cabinet Installation Guide

Once all cabinets are hung, doors are on, and drawers glide smoothly, take a step back.

  • Inspect All Seams: Look for even spacing between doors and drawers.
  • Check Surfaces: Run your level across the top of all base cabinets one last time.
  • Test Functionality: Open and close every door and drawer multiple times to ensure the hardware settled correctly.

A successful cabinet installation means your kitchen is ready for countertops. Following these steps for mounting kitchen cabinets and mastering the placement of cabinet hanging hardware will result in a professional-looking, durable result.

Frequently Asked Questions (FAQ)

Q: How far apart should screws be when securing upper kitchen cabinets to studs?
A: Generally, you should place screws every 12 to 16 inches along the back rail of the cabinet, ensuring that every screw lands directly in the center of a wall stud.

Q: What is the ideal measurement for the gap between base cabinets and upper cabinets?
A: The standard, most ergonomic distance for the gap between the countertop (sitting on base cabinets) and the bottom of the upper cabinets is 18 inches.

Q: Can I use drywall anchors instead of studs for mounting kitchen cabinets?
A: No. Drywall anchors are not strong enough for the static and dynamic loads placed on cabinets. For both securing upper kitchen cabinets and hanging base cabinets, you must use screws that penetrate deep into solid wood wall studs.

Q: What is the purpose of shimming when leveling kitchen cabinets?
A: Shimming is used to create a perfectly plumb (vertically straight) cabinet box when the wall itself is uneven, bowed, or out of square. Shims fill the void between the cabinet back and the wall.

Q: Are specialized tools like a kitchen cabinet hanging system worth the investment for a DIY project?
A: While not mandatory, systems that use hanging rails can significantly speed up the process and improve accuracy, especially for hanging long runs of upper cabinets. They help achieve results closer to professional cabinet installation techniques.

Leave a Comment